Project Summary
BPA hired Lattice Energy to conduct a field study in 2019 to gather data on current installation practices related to appropriate sizing, commissioning, and thermostat controls. All of these affect how efficiently heat pumps operate.
Methodology
The results of the study helped BPA and utilities understand current practices and identify areas for improvement in their heat pump programs.
Results
The results of the study helped BPA and utilities understand current practices and identify areas for improvement in their heat pump programs.
Key Metrics
150+ heat pumps monitored
Real-world performance data collected
BPA program design informed