Bonneville Power Administration – Heat Pump Field Study

CLIENT

Bonneville Power Administration

YEAR

2019

LOCATION

Pacific Northwest

Project Summary

BPA hired Lattice Energy to conduct a field study in 2019 to gather data on current installation practices related to appropriate sizing, commissioning, and thermostat controls. All of these affect how efficiently heat pumps operate.

Methodology

The results of the study helped BPA and utilities understand current practices and identify areas for improvement in their heat pump programs.

Results

The results of the study helped BPA and utilities understand current practices and identify areas for improvement in their heat pump programs.

Key Metrics

150+ heat pumps monitored Real-world performance data collected BPA program design informed